Archive ID: F01344

FullBack Print Main ArchiveThumbnails


Full image size: 950 x 760  DG


2007   Saipan Modulator Upgrade Project: February 7, 2007 (Day 24). David Creel replaces the old panel which contained spaces for twelve meters, with one that holds just ten. The meters for the high power modulator vacuum tubes were no longer needed because of elimination of the tubes. See image #1345 for a view from the front of the transmitter.